When a permit is required
The general rule across the metro: a new deck, a porch, and structural changes to an existing deck require permits; simple like-for-like board replacement generally does not. Decks above a certain height or size, decks with roofs, and anything touching the house's structure sit firmly on the permit side of the line in the City of Richmond, Chesterfield, Henrico and Hanover alike. The exact thresholds are your jurisdiction's to state, and a reputable provider confirms them for your address before work is scoped — because building first and asking later is the most expensive order of operations in the trade.
Resurfacing sits in the middle: pure surface replacement is typically permit-free, while resurfacing that renews stairs, changes rails to meet code, or corrects structure can cross into permitted territory. The scope conversation names your project's position explicitly rather than assuming it.
What the application contains
A deck permit application is a drawing exercise: a site plan showing the deck against the lot's lines and setbacks, and construction drawings showing footings, framing sizes and spans, the ledger connection, stairs and guard details. These are not formalities — the span tables and connection details on the drawings are the same ones the inspector will measure against in your yard, and they are where undersized designs are caught on paper instead of in the field.
Review takes its own time in each jurisdiction — days to a few weeks depending on the queue and the project's complexity, with porches and roofed structures at the longer end. Honest project calendars carry the permit window as its own line, before the build's first day is promised.
The inspection sequence
Three gates are typical. The footing inspection, before concrete: holes at the required depth and size, in undisturbed soil. The framing inspection, before decking covers the structure: ledger connection, joist sizing and spacing, connectors and posts, all visible and measurable. The final, on the finished deck: rails, stairs, graspability and the completed details. Each gate is a stranger with a tape measure verifying that the structure your family will stand on matches the code that decades of deck failures wrote.
Failed inspections are corrections, not catastrophes — a connector added, a bolt pattern fixed — and they are least costly at the gate where they are caught. This is the system's design working as intended, and it is why permitted work carries a paper trail that matters at resale: the next buyer's inspector will ask, and the permit file answers.
Why unpermitted decks haunt their owners
The unpermitted deck's costs arrive later and addressed to the owner: a buyer's inspection flagging it at sale, an insurer questioning a claim after a failure, a county inquiry after a neighbor's project reveals the comparison. Retroactive permitting usually means opening the structure for inspection — decking removed, footings exposed — at multiples of the original process's cost and trouble.
None of this makes the permit a joy. It makes it what it is: the least costly point in the project's life to prove the structure is right, with the proof filed where future owners, insurers and inspectors can find it. Providers who handle the process as part of the project — drawings, filings, inspection scheduling — are not adding a service; they are doing the job in its legal shape.